Dual CompactPCI chassis with custom backplane

Requirements

This application specified a central station for controlling, monitoring and storing critical shipboard systems and information. An extended display video wall was needed to display real time status information. Up time and reliability requirements demanded design strategies to meet the specification. High temperatures, shock and vibration requirements demanded a rugged design. Perform complete verification, validation, and qualification testing along with all supporting documentation.

Solution

The system includes network redundancy and hot swap in a dual star architecture. Shelf managers, alarm cards and power supplies feature N+1 redundancy with hot swap. Most major components including the SBCs, allow hot swap. Shelf manager and alarm modules provide IPMI based system status and control features for temperature, voltage and health monitoring to all major components.A custom graphical system representation allows visual feedback of system status. The system uses extended temperature 2.5‘‘ hard drives and is mounted in shock isolated cabinets at deployment.

Benefits

Elma Electronic is a single point of contact for warranties, support and spare parts sharply reducing MTTR. Extensive testing suite yields highly reliable performance of this critical shipborne system. Our experience leads to improved schedule adherence and reduces overall program risk.

Downloads

Read More

Avionics Instrument Sensors development for Joint Strike Fighter Program by Elma. Robust design and customer relationship secured the win.

Avionics instrument sensors

April 16, 2025

Avionics Instrument Sensors development for Joint Strike Fighter Program by Elma. Robust design and customer relationship secured the win.

Rugged Cabinet Case Study - AN/SPY-6 Radar System

Case Study: AN/SPY-6 Radar System

August 8, 2025

Rugged Cabinet Case Study - AN/SPY-6 Radar System

Rugged Cabinet Case Study - Aegis Combat System Fire-Control Hardware Cabinet

Case Study: Aegis Combat System Fire-Control Hardware Cabinet

August 8, 2025

Rugged Cabinet Case Study - Aegis Combat System Fire-Control Hardware Cabinet